Call Us: 020 7186 6238

News

LATEST NEWS

8 luxury apartments & 1 office in W14

Latest project in W14 will beavailable summer 2016.  Look out for our updates!

Read more

Pub conversion update

Pub conversion update

Captain Cook is taking shape – check out our Instagram or Facebook for the latest pictures

Read more

Grade II London Townhouse

Grade II London Townhouse

An exciting new project working with conservation officers to upgrade this listed Georgian London townhouse including roofing works, internal modifications and the addition of a garden studio.

Read more

Latest flat refurbishment

Latest flat refurbishment

Total refurbishment of this London two bedroom flat and modification to allow three double bedrooms.  Watch this space for pictures of the finished product!

Read more

Pub conversion update

Pub conversion update
Read more

Warehouse refurbishment

Warehouse refurbishment

Brief: to convert warehouse space into a modern storage unit Project timeline: 4 months Major challenges project presented: the size of the building was the biggest challenge.  Although the actual work would not be difficult, the amount of people to be coordinated would need to be very […]

Read more

Period mansion block – external works

Brief: repair and replace the roof and windows of an old period mansion block.  Replace the balconies with galvanised steel to match existing designs Project timeline: 8 months Major challenges project presented: coordinating between different tenants living in the blocks to ensure minimal disruption to their lives. […]

Read more

Basement conversion into flat

Basement conversion into flat

Brief: convert old storage room into modern two double bedroom flat Project timeline: 12 weeks Original condition of building: it had been used as a storage unit and commercial property as an ironmonger for some years Major challenges project presented: unit stood at the bottom of a […]

Read more

Warehouse conversion

Warehouse conversion

Brief: to convert a run-down warehouse into a state-of-the-art logistics warehouse Project timeline: 6 months Original condition of the building: the warehouse was run down.  The roof was leaking in places, shutters were not functioning or secure, windows were in need of maintenance.  There was some small […]

Read more

Farmhouse refurbishment

Farmhouse refurbishment

Brief: update and repair (reusing as many materials as possible) an old farm house and convert into a modern family home.  Ensure all outbuildings are child-safe. Project timeline: 11 months (before the children start school) Original condition of building: the roof was badly leaking with tiles missing […]